Hofsteig waste material collection centre, Lauterach
Hofsteig waste material collection centre, Lauterach

Project Information

15_24

Client
Altstoffsammelzentrum Hofsteig (in Gründung)

Location
Lauterach (A)

Competition
2015

Projektphasen
Competition
Implementaion

Rights
Text Hermann Kaufmann + Partner ZT GmbH,
Translation Bronwen Rolls

Image HK Architekten

Project Stakeholders

Hofsteig waste material collection centre, Lauterach

1st place

Ensemble

The recycling and waste collection centre in Hofsteig, together with the existing district heating plant, is recognised as one creative and functional unit.

Facade

In response to the heterogeneous development of the environment, the outer facade of the ASZ should be designed to correspond with the local heating plant. The aim is to achieve a creative interpretation of “reassurance”, and the qualities of the existing facade can be transferred to the new project. The strong timber facade is a natural fit to the Lauteracher Ried (a conservation area), which also supports the ideas of recycling and resource-efficient construction.

Stage

Due to the boarders on three sides and the facade forming the ‘4th wall’, a noticeably “tidy” overall impression is achieved with minimal extra effort. Only the east side, which is oriented towards the street, remains open creating the “stage for recycling”.

Tree

The large oak tree on the property is integrated into the architectural concept. The tree forms a “natural pivot”, which divides the facade and the building arrangement. The facade is softened in this area with the use of slats. Narrow glass strips allow views beyond the building and ensure sound insulation.

Simplicity

The structural design of the two buildings should be as simple, inexpensive and appropriate to the buildings purpose. A roof construction was chosen that incorporates parallel girders, which are held by tension cables. This simple construction is calming in comparison to all the action on the ground.

Traffic

The traffic flow of trucks and visitors were completely reconfigured, so that there can be no congestion during the day. By integrating the ramps and barriers into the building, the forecourt remains flexible and offers sufficient waiting areas.

more