Stubenbach Lech
Stubenbach Lech

Project Information

14_05

  • Project Leader
    DI Mathias Schädler
  • Colleague
    Andreas Ströhle M.Sc.
  • Cost Planning
    wohnungseigentum Tiroler gemeinnützige Wohnbaugesellschaft m.b.H., Innsbruck
  • Builder-Owner
    Wohnungseigentum Tiroler gemeinnützige Wohnbaugesellschaft mbH, Innsbruck

    Location
    Lech

    Completition
    2017

    Project facts
    n.b.ar. 2745,8 m², GFA 1414,6 m²,
    GBV 10.144 m³
    Energy 21 kWh/m²a

    Rights
    Text Tina Mott
    Photo Norman Radon

    Project Stakeholders

    Stubenbach, Lech

    Three times three.

    The implementation of a non-profit housing project in the internationally renowned winter sports resort of Lech am Arlberg represents a special building task. This exclusive location drives up the square meter prices of rental properties and makes affordable living a challenge. The costs must therefore be calculated exactly, but savings must not be made in the wrong places to safeguard the quality of life and the well-being of the residents.

    On a steep westerly slope in the district Stubenbach 18 housing units, with two to four rooms are built. In order to record the grain of the surrounding area, and to ensure optimal lighting, the volume was divided into three parallel, analogue-sized building structures.

    These are connected by an underground car park and the costs effectively designed common facilities of the site. The wings of the building have three storeys, in each of which are two differently formatted apartments, which open onto generous front balconies. Here the tenants can enjoy the mountain panorama and the afternoon sun. The units on the ground floor have smaller dimensions. On the floors above, the segmented building structure allows for orientation of the floor plans in two directions.

    The development was built in solid construction and the asymmetrical saddle roofs are covered in sheet metal. A fine vertical formwork, made of spruce boards, envelops the volumes, and windows and doors are also be made of timber. Walls and ceilings of the interiors are kept entirely in plain white, while the floors are covered with high-quality oak parquet. Heating is provided by the district heating from biomass and controlled ventilation ensures heat recovery in this comfortable, low energy house.

    Projektbilder