Interpark Focus – Impulszentrum, Röthis
Interpark Focus – Impulszentrum, Röthis

Project Information

03_12

Warning: Undefined property: WP_Error::$slug in /home/.sites/3/site2726081/web/v72/wp-content/themes/hk7-2/functions/shortcodes.php on line 1197 Warning: Undefined property: WP_Error::$slug in /home/.sites/3/site2726081/web/v72/wp-content/themes/hk7-2/functions/shortcodes.php on line 1197
  • Project Leader
    DI Christoph Dünser
  • Colleague
    Ing. Benjamin Baumgartl
  • Cost Planning
    Bmst. Gerold Hämmerle
  • Building Site Manager
    Harald Seidler
  • Builder-Owner
    Competence Investment AG, Lustenau

    Location
    Röthis

    Completition
    2007

    Project facts
    n.b.ar. 4.500,00 m², GFA 5.860,00 m²,
    GBV 24.960,00 m³

    Rights
    Text Claudia Wedekind,
    Translation Bronwen Rolls

    Photo Angela Lamprecht

    Project Stakeholders
    • Structural Engineering
      Mader & Flatz Ziviltechniker GmbH, Bregenz
    • Heating Ventilation and Sanitary Planning
      GMI Ingenieure, Dornbirn
    • Electronics Planning
      Ing. Gerhard Morri, Aldrans
    • Building Physics/Acoustics
      DI Dr. Lothar Künz ZT GmbH, Hard


    Interpark Focus – Impulszentrum, Röthis

    A tower visible from afar. A front square and facilities for communal use. The Impulszentrum, Interpark Focus is the new administration and architectural centre of an industrial area in Feldkirch-Röthis.

    The “Interpark Focus” is a group of enterprises clustered together in an industrial estate in Vorarlberg, Austria. It got its clearly-defined focal point with the “Impulse Centre”, a six-floor tower structure with approx. 2,700 m² of rent-able office space, and a three-floor wing designated for the owning company, all connected by a glass section, in which you find the main entrance. Via a light-flooded foyer there are seminar spaces, as well as a restaurant, that are available for use by all the companies in the building. The cubic structures were realised in three-formed, pre-cast, reinforced concrete segments, which support the reinforced concrete ceilings with a few steel supports, and which guarantee a free disposition of the floor plan and a high flexibility in its utilisation.

    Due to the fact that these pre-cast segments are staggered from one floor to the next, the cladding is rhythmically structured and the whole structure has an appearance which is in dialogue to the plant of the neighbouring company Jura („Interpark Focus 1“), which was also realised by Hermann Kaufmann.  The tower is visible from afar and it is the landmark that is associated with the industrial park. At the same time, it is an essential site for meetings and communication thanks to the infrastructure facilities and the square placed at its front.