Die Drei – Advertising Agency, Dornbirn
Die Drei – Advertising Agency, Dornbirn

Project Information

99_70

  • Colleague
    Wolfgang Hammerer
  • Cost Planning
    Bmst. Ing Norbert Kaufmann
  • Building Site Manager
    Harald Seidler
  • Client
    Die 3 Werbeagentur, Dornbirn

    Location
    Dornbirn

    Completition
    2001

    Project Facts
    n.b.ar. 504,00 m², GFA 844,00 m²,
    GBV 2.820,00 m³

    Rights
    Text Hermann Kaufmann + Partner ZT GmbH,
    Translation Bronwen Rolls

    Photo Bruno Klomfar

    Project Stakeholders
    • Structural Engineering
      Mader & Flatz Ziviltechniker GmbH, Bregenz
    • Heating Ventilation and Sanitary Planning
      GMI Ingenieure, Dornbirn
    • Electronics Planning
      Manuel Krekeler, Rankweil
    • Green Space Planning
      DI Barbara Bacher, Linz


    Die Drei – Advertising Agency, Dornbirn

    A low energy concept that blends with the urban surroundings.

    The office building of the advertising agency – DIE DREI – in Dornbirn, Rohrbach sits in an urban area of old timber houses and new single-family and multi-family houses.

    The property includes an underground car park and office space on the ground floor and first floor. It is designed as a low energy building and equipped with controlled ventilation. The building shell consists of timber prefabricated elements with 30 cm mineral wool insulation.

    To improve the indoor climate in the summer, the ceiling of the ground floor is made of reinforced concrete (night cooling through window ventilation). The facade concept for the upper floors is realised in Larch timber that changes with weathering, and so the building can relate to the existing timber houses of the surroundings. A Corten steel was used for the facade cladding on the ground floor.

    Projektbilder