Searchresults for cheap tickets on turkish airlines to istanbul phone number 1-800-299-7264

  • SWG screw factory Gaisbach GmbH, Waldenburg

    ...extension. The design team led by Prof. Hermann Kaufmann and his partners argued emphatically for the realisation of an autonomous new building in order to avoid disruptions to ongoing operations and problematic connections and transitions. In addition, a confident architectural...

  • Gutsbetrieb Rheinhof, Hohenems

    ...is airy and marked by a large number of unique elements. This is related to the decision to use timber from nearby forests: the length of the wood was limited to that which could be found locally. Gluelam technology was...

  • Community Centre, Ludesch

    ...standard product range. The selection and processing of the materials was subject to continuous inspection. Data sheets for each and every one of the project’s 214 products give detailed descriptions of their composition and ecological quality. In addition to the...

  • 3-fach Sporthalle, Kempten

    ...placed in relation to the existing buildings in order to create a sequence of three topographically staggered courtyard spaces that lead into the park, which is to be opened to the general public. Together with the school building and the...

  • Student Housing, Rosenheim

    ...is designed according to aspects of low basic energy consumption and compliance with the open space requirements. The structure appears compact and closed to the outside, but it forms a formal opening to the southeast to Marienberger Strasse. A sense...

  • Recycling Centre Vorderland, Sulz

    ...noise and emissions, but opens up via the saw-tooth loading bay to the access road. It was desirable to reduce the number of materials and components used to just a chosen few, the large-scale roof construction transfers its static loads...

  • Hotel Schmiedberger, St. Johann

    ...characteristic Alpine vistas. The guest reaches the centrally located reception via an attractively designed lobby that is in direct relation to the spacious outdoor terrace over the lounge, as well as to the breakfast room and the spa area. Starting...

  • Hauser, Hohentannen

    ...already been determined. One of the challenges of the project was to develop a high degree of autonomy and creativity within the predefined strict framework. »Many build only once in a lifetime. Therefore, it is natural for us to get...

  • Zerlauth, Frastanz

    ...on the urban periphery, densely surrounded by other structures. The view to the west extends to the Swiss Alps. Access to the house is from the east side, which is the highest point on the site and where one enters...

  • Sutterlüty, Hohenems

    ...the desired temperature. The hydraulic system was optimised in such a way to allow the same system to be used for the heating and cooling, reducing the production costs and also adding further reductions to maintenance costs for daily operation....

  • Brock Commons Tallwood House, Vancouver

    ...Only on the top floor, which serves as a recreation room for the students, the timber is visible and provides a window into the construction method used to create the skyscraper. A redundant system supplies the sprinkler system with water...

  • Haus mitanand - Ellenbogen, Bezau

    ...floor is the care units and a lounge with gardens with covered areas. The historical elements of the collection are to be preserved or restored and integrated into the new building concept. The energy efficiency is improved with the renovation...

  • Hotel Schwanen, Bizau

    ...space was converted into a small hotel with 40 beds. From the two-and-a-half-story farmhouse hotel, a partially plastered, three-storey solid construction was based on an approximately square floor plan. Both materialisation and design did not match either the location or...

  • Unterstein, Langenegg

    ...the Bregenzerwald apparently again is a viable option for people. This steady population growth also led to an increase in construction in the region. Part of this recent boom is the two residential buildings in the district of Unterstein Langenegg....

  • Im Haag, Lauterach

    High-quality and unobservable retreat areas increase living quality. A large building plot was reconfigured, due to the demolition of a centrally placed house, allowing two duplex units to be built. The elongated main structure, with its exact southern orientation...

  • Raiffeisenbank, Egg

    ...energy consumption to a minimum, so that a Passive House standard is almost reached. The added value for the Bregenzerwald region is the fact that approximately 85% of the work was awarded to Bregenzerwald craftsmen or to customers of the...

  • Provost Residence St Gerold - Riding Hall, St. Gerold

    ...rest on the tip of a tension strip. The black, slender steel tension bars fade into the background, hence the straddles seem to hover over the room, giving it a sense of dynamism. The diagonal elements set in front of...