Searchresults for cheap airline tickets to charleston sc from hartford ct in august phone number 1-800-299-7264

  • 1st prize for a proposed development of the former Spicher school

    ...approximately 7,500 square meter area is located between Metzstraße to the north, Koboldstraße to the west of the Stadtberger Straße and the Spicherer Straße to the east. A total of 70 timber-framed apartments are planned, including fully accessible living and...

  • Timber Construction Day 2019: Lecture in Oslo

    This year’s Timber Construction Day will be held on September 4 at DOGA in Oslo. It is an arena which brings together the latest from the world of timber architecture including technical innovative solutions, modern use of timber and award-winning...

  • Fernpassstraße receives recognition from the Prize for Quality in Housing 2015

    ...the research project ‘TES-Energy-Facade’ from the Technical University of Munich. This resulted in exceptionally good energy efficiency and an overall ecological concept. In addition, the project is a positive example of ’embodied energy’ utilisation. From a sociological point of view,...

  • Experts discuss the very best Timber has to offer

    ...the Blaha in Korneuburg. The lecture schedule includes special projects, such as the SWG screw production hall and the St. Michael training centre. Examples from residential construction are also included. From architects to structural engineers and students, everyone is invited...

  • Awarded 1st place in the bid for Russareal Lochau

    ...individual buildings, both the semi-detached houses to the east, and the longitudinally oriented multi-storey buildings to the west, are incorporated into the structural system. The height of the individual residential buildings is three to four storeys, the commercial building on...

  • The most beautiful books in Austria 2008: Hermann Kaufmann Woodworks

    The most beautiful books in Austria 2008 have been announced. In the awards 56th year, a total of 15 books were selected, including Hermann Kaufmann’s ‘Woodworks’. The award is given to those publications whose design, concept and manufacturing quality is...

  • Gold for Klimaaktiv flagship development Unterstein in Langenegg

    Federal Minister for Sustainability and Tourism Elisabeth Köstinger honours 94 sustainable building projects from Tyrol and Vorarlberg. On Wednesday, April 3, Federal Minister Elisabeth Köstinger awarded sustainable construction projects and companies in Innsbruck. A total of 87 buildings from Tyrol...

  • wienwood 15 - Holzbaupreis honours Mühlweg

    ...Vienna. The experience gained from this project paved the way for subsequent wooden buildings. As an internationally respected milestone, this catalyst project joins other hybrid wooden constructions from Dietrich | Untertrifaller and Hubert Rieß to be honoured with an award....

  • Hermann Kaufmann takes part in leading TV-documentary from arte. He explains the role in sustainability of wood and timber architecture. Our recommendation "A New World" - now on arte

    Watch the documentary: “A New World” – arte Online: 08/11/2022 – 08/07/2023 In 6 languages available...

  • DAM Exhibition - Nice out here, from 27th March - 27th November 2022 in Neu-Anspach

  • Detail: The world's largest roof structure made from Baubuche laminate

  • Hermann Kaufmann erhält den Spirit of Nature Wood Architecture Award 2010

    ...Kuma from Japan, Richard Leplastrier from Australia, and Switzerlands Peter Zumthor. Two years ago the award went to the Chilean architect José Cruz Ovalle. In addition to his work as an architect, Hermann Kaufmann has been a professor at the...

  • An update from Nebelhornbahn restaurant

    The new restaurant at the summit of Nebelhorn will open on 22nd December 2016. This impressive dining location is well worth a visit.

  • The SWG Schraubenwerk project receives an award for good building culture

    ...district, 16 from the Main-Tauber district and 14 from the Schwäbisch Hall district. We are delighted to announce that the SWG was one of these award winners. Comments from the jury: “With the Schraubenwerk Gaisbach, two companies originating and based...

  • Groundbreaking ceremony, Munich - Ingeborg Pohl Kinderoase TUM, cooperation with Francis Kéré

    ...this exceptional design by Kéré Architecture and will continue to do so. For the childcare project, they are receiving support from GAPP GmbH in Munich, which has been entrusted with professional project control and construction project management. Further information: ...

  • klima: aktiv Gold for Multi-Apartment Construction in Sulzberg

    ...presentation of the plaque klima: aktiv Gold to Günter Morscher in the presence of Mayor Helmut Blank by Erich Schwärzler and Martin Ploß from the Energieinstitut Vorarlberg as regional partner of the program klima: aktiv Bauen und Sanieren, took place....

  • Our new book is at the printers.

    ...pleasant atmosphere and sustainable construction in line with the corporate identity. This screw factory shows the future potential for the use of timber in industrial construction. The project is comprehensively documented in this book, from different perspectives as well as...

  • Awarded 1st place for the new Zünd Systemtechnik project in Altstätten

    ...a change is made from a timber-concrete composite to a multilayer laminate timber panel, which must also be formed into a pane. The structure itself does not alter due to the impact reduction. The horizontal impacts are directed over the...

  • Lecture Detail Congress 2019

    ...planners, top-class personalities from architecture and research shed light on the topic from different perspectives. Building projects are presented and solutions and reference projects are shown that represent and reflect upon the critical subject of “rural space”. The experts explain...

  • thomaswechspreis 2018: Recognition for Schmuttertal Gymnasium

    ...to builders and architects every three years. A total of 67 works from all over Bavarian Swabia were submitted to this year’s awards. In the first online round, the three international jury members Bernardo Bader (Dornbirn, Vorarlberg, Austria) Armand Ruinelli...

  • Lectures in Ulm on contemporary timber architecture

    ...building system, called the LCT (LifeCycle Tower). The second is on the design of the Högl winery. This is an unmistakable, unpretentious and quietly confident project that is proudly settled into the Wachau landscape. The architects Ludescher & Lutz have...

  • New Caritas headquarters build begins in Salzburg

    ...subsidised apartments will be built. In addition to administration departments, the new Caritas headquarters will also include social counselling and a new Carla second-hand shop. The construction is scheduled to be completed in March 2019. In the new Caritas headquarters,...

  • The environmental education centre, Britzer Garten, is complete

    ...contemporary architecture, made from largely renewable raw materials. The new construction appears to be a floating pavilion, nestled between the old trees surrounding it. The interplay between façade, environment, exterior and interior encourages curiosity and lures visitors of the Britzer...

  • Schmuttertal Secondary School wins German Wood Construction Award 2017

    ...jury evaluated more than 200 works, ranging from ambitious new buildings, to innovative renovations, to pioneering developments in product development. Owners, architects, structural engineers, and wood construction companies were honoured for their excellent contributions to timber construction. This year, four...

  • Hermann Kaufmann Wins the Global Award for Sustainable Architecture 2007

    ...committee of the Global Award. It was designed to gather together, and connect, public and private stakeholders who believe that sustainable housing offers immediate opportunities to contribute to the common good and to stimulate the international debate around sustainable architecture....

  • IZM - Illwerke Zentrum Montafon nominated for State Prize for Architecture and Sustainability 2014

    ...in harmony with the local environment and nature is possible.” said Federal Minister Andrä Rupprechter at the award ceremony held this week. From 74 to the top 5 winners In the categories of “new construction” and “renovation” there were a...

  • Architekten Hermamm Kaufmann wins the tender to design for the Wildlife Park Pforzheim

    ...and this fits perfectly into its surroundings,” says Stadtbau’s managing director Ulrich Füting. In the two buildings, the areas of information and services, gastronomy, school classes and education, and the shop are all beautifully presented. Between the two buildings one...

  • Architecture on the spot 128: Wagner GmbH

    ...social affairs, trade and industry. The high-quality architecture is presented by their inhabitants, who guide the visitors through their spaces, report from the first idea to the current usage, about all project phases and answer questions. The participation is free....

  • Insight into the exciting YKK project in Japan - exclusive interview with the project team

    ...board to deliver their latest development project. The HK team working on the project will pay their first to Japan this month. To introduce the project and to start telling the project’s story we have interviewed one of the projects...

  • Breaking Ground at Illwerke Center Montafon

    ...the man made modifications to the land and large, two-storey blocks of flats. This stance is not unusual in architecture in the Alpine regions and is in the tradition of structural engineering of power plant construction in the region of...

  • Hermann Kaufmann receives the Toni Russ Prize

    ...to draw in around 5000 visitors to Vorarlberg a year. Flourishing The prestigious speaker Achleitner, author of the only standard work on architecture in Austria, recalled the “roots of the revolution” of the internationally established Vorarlberg architects. In order to...

  • Orange Farm

    Kindergarten South Africa

    ...together” in South Africa. In the summer, 29 architecture students from the Technical University of Munich built a nursery school in Johannesburg in a township (Orange Farm), from design to execution planning to on-site, construction management and fund raising. The...

  • Winner of the Schmiedberger Boutique Hotel

    ...and seminar rooms. The necessary feeling of intimacy, required in these particular areas because of their function, has been delivered in the formulaic design of the space. Direct daylight also adds the visual screen affect. The residential complex in the...

  • Exhibition Berlin Bauen mit Holz – Wege in die Zukunft (building with wood – ways into the future)

    ...1990s and it continues to gain momentum every day. This familiar material presents itself in new and diverse forms. Continuous researching has resulted in enormous developments and improvements in construction technology and furthermore, the new computer calculation methods, and the...

  • DETAIL Editorial May: The roof of the Nebelhornbahn cable car station is being anaylized

    ...the current issue, we show less spectacular examples that have one thing in common: They are in the context of historic roofs. Dietrich Untertrifaller’s wide overhanging wooden roof ducks into the landscape within sight of Munich’s Olympic tent, as does...

  • 24.-25. April | Mission: Climate-friendly timber construction culture | Lecture Christoph Dünser

    ...construction offensive and in cooperation with vorarlberger holzbau_kunst, Proholz Bayern and Lignum Holzwirtschaft Schweiz. Vanue: Graf Zeppelin Haus, Friedrichshafen Lecture: Christoph Dünser, HK Architects Day 2 at 11:30 | Topic: Structural building with hardwood Tickets and further information at: proHolzBW...

  • New building in Neubaugasse

    Low-cost housing for Lauterach On 6 October, Wohnbauselbsthilfe and Rhomberg Bau launched their joint new building in Neubaugasse in Lauterach. Through to autumn 2023, the developer and the general contractor will build a modern complex with 38 affordable flats in...

  • The Olpererhütte Ginzling receives the Best Architects Award 2009

    The “Best Architects 09” award received the highest number of entrants since the awards were founded. 189 outstanding projects were submitted to the award. This year’s jury found it particularly difficult to select the best of the best. A total...

  • Hermann Kaufmann Awarded Bezau Assisted Living Development

    ...and the new modern finish are prominent in the design. The exterior design of the building responds respectfully to the shape quality of the original building and integrates into the overall appearance. The large-format sliding elements are functional offering protection...

  • Hermann Kaufmann receives Bavarian Architecture Award and State Prize for Architecture

    ...Architecture Prize can also be honoured with the Bavarian State Prize for Architecture if it makes a special contribution to building culture in Bavaria. The winners of the “Bavarian Architecture Award 2021” received their awards from Chamber President Prof. Lydia...

  • The Federal HolzbauPlus 2020: Recognition for SWG Schraubenwerk

    ...since 2012. Building with renewable raw materials is an active contribution to climate protection because trees store tons of CO2 and remove greenhouse gases from the air. The CO2 remains stored even after the tree has been processed into building...

  • BDA regional award: TUM research station Friedrich N. Schwarz makes the shortlist.

    55 projects have made it into the next round of the BDA Regional Prize Über Oberbayern 2021, creating this year’s exciting shortlist! A total of 104 valid projects were submitted to participate in the first-ever BDA Regional Prize Über Oberbayern...

  • "Haus Mitanand", Bezau is nominated for a Constructive Alps 2020 award

    ...are holding the “Constructive Alps” international architecture competition for the fifth time. The international jury has nominated 28 projects from 328 submissions, including our “Haus Mitanand” project in Bezau, which is an excellent example of carbon conscious renovation and construction...

  • A new Sutterlüty supermarket opens in Rankweil

    On Thursday November 21st a new experience in shopping opens on Landammanngasse in Rankweil. Large, open arches greet customers and reflect the market hall character of the fresh produce displays. This new open concept idea flows through the entire shop...

  • Virtual tour of the energie.campus Montafon

    ...to get an impression of ​​the new building during a virtual tour of the planned building. Numerous apprentices also took the opportunity to look into the future via tablets and smartphones and they are already looking forward to their new...

  • Vorarlberger Holzbaupreis 2019: 1 prize and 3 recognitions

    Once again the prestigious Vorarlberger Holzbaupreis awards took place, celebrating the special achievements made in timber design and building. For the thirteenth time outstanding timber were awarded across various categories. We are very happy to have received the following awards:...

  • Ground breaking ceremony for ASZ Vorderland

    ...the people in the region, something the President Sonderegger is sure of. The project is “inter communal” in several ways, as Sonderegger noted. The fact that 11 municipalities (specifically: Fraxern, Klaus, Laterns, Meiningen, Rankweil, Röthis, Sulz, Übersaxen, Viktorsberg, Weiler and...

  • Opening of a new exhibition: Architecture in the Allgäu 2006-2015

    The exhibition accompanies a guide of the same name, published by the Architekturforum Allgäu as the second volume on Neuer Bauen in the region by art publisher Josef Fink. Again, there are residential and commercial buildings, schools, industrial buildings, infrastructure,...

  • Building work begins at SWG Schraubenwerk Gaisbach GmbH

    Expansion of production facilities SWG Schraubenwerk Gaisbach GmbH is a leading manufacturer of screws for the construction industry based in Waldenburg. The global company has state-of-the-art manufacturing facilities. The product range includes timber construction screws, screws for fixing metal and...

  • 8th International Forum on Timber Construction in Dijon France

    France’s construction sector is picking up again, with almost half a million homes approved in 2017 and around 420,000 building permits granted. The demand is enormous, and the trend towards timber construction goes from strength to strength. Timber construction in...

  • The Priory St Gerold recevies Constructive Alps 2017 recognition prize

    To respect and maintain the integrity of the monastery, wherever possible, the existing building materials where utilised in the renovations of St Gerold, and new buildings are placed outside its beautiful monastery courtyard. With continued consideration to protect the monument,...

  • German Architecture Award 2017 for Schmuttertal Secondary School

    ...second year, to outstanding architectural achievements. The jury had to select the winner from 160 superb submissions. The Schmuttertal Secondary School Diedorf, which was built by order of the Augsburg district, is constructed as a resource-conserving, plus-energy house, in a...

  • Triple win at the 2017 Vorarlberg timber construction awards

    ...over 140 submissions from projects across various categories. Three of our projects were honoured on the night; Schmuttertal Gymnasium: recognition, category Outside the Country Propstei St. Gerold: recognition, category Renovation Passive House Plus Housing Area Unterstein: recognition, category Multi-occupancy dwelling...

  • Unterstein Langenegg receives the Klima:aktiv award

    ...optimisation during operation. In this category, the energy quality of the building is evaluated on the basis of its real energy consumption. For the first time, three buildings won in this category, including the project multi-family house Morscher in Langenegg....

  • Mühlweg Vienna Receives Best Architect Award

    ...in a city like Vienna? In the minds of many people, burning cities are in the recent history. Moreover, due to the absence of timber construction in many parts of Austria, the special qualities and excellence of performance of this...

  • Prize Awarded to the Recently Built Administrative

    Buildings of Erne Fittings

    From a town-planning perspective, a three-storey building is required, but it has to be one that will form a balance between the large-scale industrial buildings and the adjacent small-scale industrial and residential areas, one that can be part of the...

  • LCT ONE - LifeCycle Tower is Awarded a Nomination of the State Prize

    ...which also has a positive effect on the energy balance due to a lower traffic volume. “The LifeCycle Tower is pioneering work in sustainability for all partners involved in the project,” says Michael Zangerl, Project Manager LifeCycle Tower. “The nomination...

  • Hermann Kaufmann Wins Contract for Illwerke Centre Montafon

    ...to increase its size. The design has many, simple reoccurring elements. Wood-concrete composite elements are located on glued timber supports integrated into the façade, which are held in the central axis by a steel beam resting on steel supports. The...

  • LCT ONE - LifeCycle Tower Receives a Commendation Award at Constructive Alps 2013

    At Constructive Alps 2013, winners from Switzerland and Liechtenstein were awarded international architecture prizes for sustainable renovation and building in the Alps. In addition to these awards, the jury also awarded seven Commendations of Excellence, including one to the the...

  • Environmental Education Centre in Berlin’s Britzer Garden Awarded to Hermann Kaufmann

    It was a larger tender process, with four architectural offices invited to participate. The goal was to create a modular building, and if possible a series of building designs that echoed the values of environmental education. The chosen design delivered...

  • The LCT ONE - LifeCycle Tower receives the Balthasar Neumann Prize 2014

    ...those it identifies as delivering outstanding technical and design qualities due to this cooperation. This cooperation does not only refer to cooperative partnerships between architects and structural engineers, but also to the cooperation of architects and engineers from various disciplines....

  • Architekten Hermann Kaufmann presents their latest book

    Individuality from a modular system: Illwerke Zentrum Montafon The new office building of the Vorarlberg power plants in Vandans is a hybrid timber construction designed and implemented by Architekten Hermann Kaufmann. On July 10, the book “Hermann Kaufmann IZM –...

  • Vorarlberger Holzbaupreis 2015: Three prizes and three awards

    ...submitted, from which the jury selected 18 awards in addition to the 13 recognised prize winners, in a total of eleven categories. Architekten Herman Kaufmann is very proud to announce that we received 6 awards. Krumbach Dorf – Multiple occupancy...

  • Illwerke Center Montafon is the klimaaktiv "Property of the Month”

    ...protection and energy saving. Klimaaktiv buildings are also planned and built in such a way that they remain largely independent of energy price developments. Buildings according to the klimaaktiv building standard already fulfil the requirements of the Directive 2010/31 /...

  • Ground-breaking ceremony for residential complex in Feldkirch, Heldenstraße

    ...ensures reduced planning costs, easier structures and faster implementation. Certain compromises in quality – like accessibility only on the ground floor and the abstinence of basement, underground parking and elevator – are knowingly accepted in order to offer cheaper housing....

  • Ceremonial inauguration of the Schmuttertal High School in Diedorf

    After two years of construction, the Schmuttertal Gymnasium was inaugurated on October 21, 2015. It was planned and built with an integral and future-oriented approach, as a nationwide unique lighthouse project. It was necessary to combine economic, ecological and social...

  • Energy and Climate Protection: Particularly climate-friendly constructions honored – such as the project Unterstein, Langenegg

    ...buildings are also the last two winners of the State Prize, the office and company building by Georg Bechter in Hittisau and the Frastanz Hofen Education Center, as well as the school in Hittisau nominated for this year’s State Prize....

  • Role Model Recycling Centre in Langerringen - Germany

    ...collaborating with HK Architekten, presented the project, which will include the tallest wooden building in the district, equipped with a photovoltaic system that generates more electricity than is used. It will be a purely wooden construction, with only the staircases...

  • We received the Austrian Green Planet Building® Award for the Brock Commons Tallwood House in Canada!

    ...objectives and strict criteria of the national climate protection initiative klimaaktiv for the building and real estate industry to an international level. The outstanding achievements of Austrian planning offices, consultants, construction companies and production plants abroad in the field of...

  • Baden-Württemberg Timber Construction Prize 2022 for SWG screw factory Gaisbach GmbH, Waldenburg

    ...pleased to have received the Baden-Württemberg Timber Construction Prize 2022 and would like to take this opportunity to thank everyone involved for such wonderful cooperation! Many thanks also to the client, SWG Schraubenwerk Gaisbach GmbH, Waldenburg for your trust.  ...

  • German Timber Construction Award 2021: Recognition for SWG Schraubenwerk Gaisbach GmbH

    ...expert jury headed by Andreas Krawczyk had to evaluate 260 entries for the German Timber Construction Award, ranging from sophisticated new buildings to inventive building renovations and new developments in the product sector. It was striking that for the first...

  • Smart Bauen is now published

    ...author presents a variety of future-oriented building concepts – starting from the individual room through to the façade, whole structure and also entire city districts. The strategies and construction principles are each considered under the aspect of an intelligent and...

  • Now available - book "SCHRAUBENWERK MIT HOLZ – Pushing the Limits of Hardwood"

    ...is a pioneering building that combines efficient floor plans, a pleasant atmosphere and sustainable construction in line with corporate identity. In this book the project is comprehensively documented from different perspectives, including in-depth technical and professional prospective and insights. Order...

  • Ground-breaking ceremony for the residential complex in Schnifis

    Opposite the cable car station in Schnifis, 15 residential units will be built, grouped together in two three-storey buildings. The two buildings contain 15 residential units, which are designed as 2-, 3- and 4-room apartments with between 48 and 92...

  • We speak in Oslo at the Norwegian Conference of Wood Architecture 2017

    DI Christoph Dünser, from Architeken Hermann Kaufman. will give a lecture on November 15 at the Norwegian Conference of Wood 2017 entitled “Wood based construction systems in bigger houses”....

  • The Swimming Pool in Mittelberg is Awards 1st Prize

    In principle, the location of the existing pool building was actually correct. The situation of old swimming pool was perfect because of its relation to the main road, its proximity to the village, and because the ground naturally swelled up...

  • Hermann Kaufmann wins project to create new apartments in Krumbach

    The two hugging buildings differ in their structure and design. One has a more ‘classical’ design and has greater access to wider internal spaces, while the contrasting building slopes down to compliment and embrace the other. The conception of two...

  • Ground breaking ceremony for Schmuttertal Gymnasium

    ...quality of energy efficiency. To achieve this ambitious goal, the project will embody the integrated approach to planning, developed from a didactic and mythological approached used by the education system. The aim is to create architectural and constructional quality by...

  • International Architecture Project BUS: STOP KRUMBACH launches.

    ...attracts over 30,000 tourists every year. New architecture in Vorarlberg continues to celebrate and utilise the craftsmanship that has shaped this region for centuries. International expertise will meet regional competence with the project BUS: STOP Krumbach, which has launched in...