Searchresults for cheap airline tickets black friday phone number 1-800-299-7264

  • Messehallen 9-12, Dornbirn

    ...disturbing support structure. On top of that is the black glazed roof structure. If required, the halls can be illuminated evenly and naturally by means of “daylight lamps” – without disturbing shadows, and without the disadvantage of individual stands. The...

  • SWG screw factory Gaisbach GmbH, Waldenburg

    ...services. In order to ensure a high degree of flexibility in the production processes, the number of supports in the hall is reduced to a minimum. The supporting structure consists of eight parallel, lengthways, 82 m long and 3.8 m...

  • Gutsbetrieb Rheinhof, Hohenems

    ...is airy and marked by a large number of unique elements. This is related to the decision to use timber from nearby forests: the length of the wood was limited to that which could be found locally. Gluelam technology was...

  • Provost Residence St Gerold - Riding Hall, St. Gerold

    ...rest on the tip of a tension strip. The black, slender steel tension bars fade into the background, hence the straddles seem to hover over the room, giving it a sense of dynamism. The diagonal elements set in front of...

  • Am Garnmarkt, Götzis

    ...house standard Öko4. It is built in mixed construction. The supporting structure, concrete ceilings, and the massive core with staircase act as the solid stiffening frame. The exterior wall is formed by non-load-bearing timber elements, with a facade of black...

  • Community Centre, Ludesch

    ...were insulated with cellulose, and sheep wool was used as the insulation material for the fit-out and finishes. Sheep wool replaces the commonly used polyurethane window insulation, costing only 800 euros more. Solid walls stiffen the structure, while slender steel...

  • 3-fach Sporthalle, Kempten

    A pillar construction as a place maker. The town of Kempten is considered the educational and administrative centre of the surrounding Allgäu region. A new triple sports hall, for up to 800 spectators, is to be built on the site...

  • Student Housing, Rosenheim

    ...built as prefabricated timber modules in the factory and then assembled on site. This design also makes it possible to minimise the number of working days on site and the associated weather dependency. The existing local system feeds low-temperature floor...

  • Recycling Centre Vorderland, Sulz

    ...noise and emissions, but opens up via the saw-tooth loading bay to the access road. It was desirable to reduce the number of materials and components used to just a chosen few, the large-scale roof construction transfers its static loads...

  • Hotel Schmiedberger, St. Johann

    ...highly thermally insulated outer shell. The element construction method makes it possible to ideally use a large number of Egger products. In addition, the interior offers different applications for the products from Egger. The outward appearance of the hotel is...

  • Hauser, Hohentannen

    Abundant space in a simple shell. A house for a movement therapist and a music teacher should be designed according to the individual needs of its residents. But in the newly developed area, a large number of planning parameters had...

  • Zerlauth, Frastanz

    The antithesis of cubist architecture, open angular rooms under an abstract roof. Frastanz, in Austria, is home to a large number of international businesses. In contrast to the Bregenzerwald region, this area is firmly in the grip of a...

  • Sutterlüty, Hohenems

    Sustainability is not a ‘buzzword’, it is the driving force behind this project. Constructing big retail centres on the outskirts of towns is often an exercise in ticking boxes, with an aim to create something as cheaply as possible with...

  • Brock Commons Tallwood House, Vancouver

    ...authorities increased the maximum number of storeys from four to six in order to increase the height of wooden buildings. For the 53 m high dorm this change was not enough. However, the campus has its own building regulations and...

  • Haus mitanand - Ellenbogen, Bezau

    ...timber according to ecological and modern structural engineering requirements, as well as the requirements of the Passive House standard. The timber cladding is in the style of the existing building that will be demolished. The large number of parking spaces,...

  • Hotel Schwanen, Bizau

    ...modernised, changed in their formation and adapted to today’s needs. Although this reduced the number of beds slightly, it has increased the numbers of rooms sold. The design deliberately retreats and is dominated by mute surfaces of timber and plaster....

  • Unterstein, Langenegg

    ...The developer Morscher Bau- & Projektmanagement GmbH from Mellau built a number of units that use the constructive language for which Vorarlberg is known. Most of the facades are made of wood – as are these two buildings. Morscher calls...

  • Im Haag, Lauterach

    High-quality and unobservable retreat areas increase living quality. A large building plot was reconfigured, due to the demolition of a centrally placed house, allowing two duplex units to be built. The elongated main structure, with its exact southern orientation...

  • Raiffeisenbank, Egg

    New headquarters of Raiffeisenbank Mittelbregenzerwald. In the middle of the village of Egg in the Bregenzerwald, Austria the new headquarters of the Raiffeisenbank will be built. One of the goals of the new building is to build a simple, but...

  • Propstei St. Gerold - main building renovation, St. Gerold

    ...a lift system and the curved safety staircase with a railing made of untreated black steel, and horizontally as an accessible corridor that surrounds the newly interpreted paradise garden as the centrepiece of the complex.~ This three-storey volume looks like...