Searchresults for best place to get cheap airline tickets phone number 1-800-299-7264

  • Haggen - residential area, St. Gallen

    analysis The neighboring development of the area has a strong differentiation and ranges from small single-family homes to large blocks of flats. Due to the sloping terrain of the property towards the north, a topographical height development results which generates...

  • Hittisauer Straße, Krumbach

    ...Hirschbühl describes it. To be more precise, however, subtle differentiation in structure, geometry and proportion reveals itself emphasised on the edges, towering rhythmically over the central yard, closed to the north, open to the south, floating to form a square...

  • Unterstein, Langenegg

    ...long and narrow. The house is almost up to the 2nd floor in the ground due to the steepness of the plot. The pedestal foundations house the basements and garages for the vehicles. To get light in the back, the...

  • Community Centre, Ludesch

    ...is integrated into the ventilation unit. All mechanical systems are fitted with meters, to allow computer based monitoring of energy use. Early in the planning, the town council decided to cover the newly created town square to allow for a...

  • Agricultural school, Salzkammergut

    ...strong green areas towards the lake are preserved and strengthened. Narrow wind protection hedges run across this and secure the terrain slopes. An orchard holds park and sports fields and dissolves further to the east and opens the view to...

  • House of Sustainability, Ruggel

    ...floors The generous facade openings and the threshold-free entrances create a smooth transition between space and building. In addition to the central main entrance it is possible to open the seminar room, cafe, exhibition and utility room directly onto the...

  • SWG screw factory Gaisbach GmbH, Waldenburg

    ...of timber required can be reduced to a minimum, saving resources. The world’s largest roof structure made of BauBuche demonstrates the scale which contemporary timber engineering can now go to. It was never possible to build to these dimensions before....

  • Hauser, Hohentannen

    ...already been determined. One of the challenges of the project was to develop a high degree of autonomy and creativity within the predefined strict framework. »Many build only once in a lifetime. Therefore, it is natural for us to get...

  • 3-fach Sporthalle, Kempten

    ...placed in relation to the existing buildings in order to create a sequence of three topographically staggered courtyard spaces that lead into the park, which is to be opened to the general public. Together with the school building and the...

  • Student Housing, Rosenheim

    ...is designed according to aspects of low basic energy consumption and compliance with the open space requirements. The structure appears compact and closed to the outside, but it forms a formal opening to the southeast to Marienberger Strasse. A sense...

  • Rathaus, Markdorf

    ...to the old town. All entrances are oriented to the courtyard. The underground car park development will be relocated from the Schlossgarten to the Schlosshof. As a spatial conclusion of a side street to the Marktstraße, the castle’s courtyard should...

  • Provost Residence St. Gerold, riding hall - renovation project, St. Gerold

    ...Architekten, have taken place. The access to the extension built on the north-east side could be organised on two different levels due to the steep slope. While a seminar room, an office and the cloakroom are on the same level...

  • Environmental Education Centre Britzer Garten, Berlin

    ...allude to the rooms of the environmental education centre. This interplay between facade, environment, exterior and interior makes you curious and entices the visitors to the Britzer Garten into the interior. Over a ramp or stairs that takes the visitor...

  • Dorfhus, Düns

    ...goods, as well as bicycles, can be quickly and easily transported to the basement via the large elevator. To relieve the stairwell during store opening hours, a direct, covered entrance to the store is provided. The design maps almost all...

  • Gastronomy pavilion Uferpark West, Überlingen

    ...two topographic elements. To the north by the steeply rising Molasse rock, and to the south by open views over Lake Constance. The pavilion integrates itself into this situation in a scenic way and includes references to both surrounding directions....

  • Jagdbergstraße, Schnifis

    ...village centre to the outskirts of the village. The differentiated composition of the two structures reacts to this specific situation. The eastern building is placed directly on the Jagdbergstraße. As the street grows denser in its approaches to the village...

  • Gutsbetrieb Rheinhof, Hohenems

    ...is airy and marked by a large number of unique elements. This is related to the decision to use timber from nearby forests: the length of the wood was limited to that which could be found locally. Gluelam technology was...

  • Recycling Centre Hofsteig, Lauterach

    ...divides into the different recycling zones. The traffic flow is resolved in such a way that the customer and industrial truck traffic does not cross. Cyclists also get their own unrestricted lane which contributes to the promotion of cycling. In...

  • Fernpassstraße, Munich

    ...use in the manufacture and processing of building materials. Timber offers the best alternative to reduce the environmental impact significantly and permanently. Complex details such as fire protection, moisture protection and sound insulation have to be considered and a solution...

  • Messehallen 9-12, Dornbirn

    The halls are designed as dark spaces to best meet today’s requirements for exhibition and event operation. The interior should take a backseat to the individually designed and illuminated stands. The annular outer wall is completely smooth and without a...

  • Provost Residence St Gerold - Hostel, St. Gerold

    ...enough daylight into the interior, the ceiling had to be replaced to make room for a two-storey room. The lighting in the shop area also serves the adjacent rooms, as it brings daylight deep into the converted building and visually...

  • Propstei St. Gerold - main building renovation, St. Gerold

    ...state-of-the-art laser technology. The Capitulum, decorated with frescoes by Ferdinand Gehr, as a representative meeting place of the monastery, was developed into a seminar room with the best technical equipment. Its historic beams were uncovered and extensively renovated, even though...

  • High-rise residential building in timber - Grieser Auen, Bozen

    ...access areas in the south-east of the building structure. These covered open spaces form a weather-protected meeting place and serve as a filter zone for the users of the community meeting place, which is located in the two basement floors....

  • A Senior Oasis, Weißenhorn

    A serene view to the garden. Being together with friends in retirement, creating a home, a place for individual needs but also a place with a good sense of community – that was the request of the owner. The space...

  • Raiffeisenbank, Egg

    ...say ‘grand’, ‘incredible’ and ‘ingenious’. This definitely applies to the bank in Egg.« Best of Austria 2010/2011 The plan is to build a 4-storey, fully timber-framed bank with a total floor space of more than 1,400 m². The individual storeys...

  • Hotel Schmiedberger, St. Johann

    ...characteristic Alpine vistas. The guest reaches the centrally located reception via an attractively designed lobby that is in direct relation to the spacious outdoor terrace over the lounge, as well as to the breakfast room and the spa area. Starting...

  • IZM – Illwerke Centre Montafon, Vandans

    ...(Lifecycle Tower) on the open market. »For a long time now, we have been working to remove the prejudice surrounding timber construction, and to restore it to its rightful place as the ideal building material of the future. A perfect...

  • Olpererhütte, Zillertaler Alpen

    ...basement is avoided due to the circumstances. The storage rooms are developed on the north side, where there is also space for helicopter delivery and possibly a cable pulley station for materials, which is directly connected to the kitchen. This...

  • Heimat Österreich, Salzburg-Liefering

    On the obvious use of the prevailing saddle roof is deliberately omitted to avoid creating poor, unusable above-ground volume. As far as possible (especially in direct connection to Lexengasse – in contrast to the distinctive gabled single-family dwellings), the buildings...

  • Pflegeheim, Mauren

    ...stacked together. The modular design means a short construction time, a fast technical fit-out, and limited disruption to the neighbours. The prefabricated rooms are ready to go to the construction site, including all installations. The sound insulation is released via...

  • Wildpark, Pforzheim

    ...contrary to the need for a ‘welcome point’, did not meet requirements. The result was the decision to situate the new building out of the forest as a powerful gesture, directly on the road. Based on a slightly adapted gastronomic...

  • Schwimmbad, Riezlern

    In principle, the location of the existing swimming pool building is correct. A building at this point manages to form a clear demarcation to the nearby village street, and to record the alternation in the terrain. We therefore proposes to...

  • Recycling Centre Vorderland, Sulz

    ...noise and emissions, but opens up via the saw-tooth loading bay to the access road. It was desirable to reduce the number of materials and components used to just a chosen few, the large-scale roof construction transfers its static loads...

  • Zerlauth, Frastanz

    The antithesis of cubist architecture, open angular rooms under an abstract roof. Frastanz, in Austria, is home to a large number of international businesses. In contrast to the Bregenzerwald region, this area is firmly in the grip of a...

  • Sutterlüty, Hohenems

    Sustainability is not a ‘buzzword’, it is the driving force behind this project. Constructing big retail centres on the outskirts of towns is often an exercise in ticking boxes, with an aim to create something as cheaply as possible with...

  • Brock Commons Tallwood House, Vancouver

    ...authorities increased the maximum number of storeys from four to six in order to increase the height of wooden buildings. For the 53 m high dorm this change was not enough. However, the campus has its own building regulations and...

  • Haus mitanand - Ellenbogen, Bezau

    ...The exterior design of the annex responds respectfully to the design quality of the previous building and integrates into a whole, while taking into account the agricultural form language in the overall appearance. The large-size sliding elements protect against the...

  • Hotel Schwanen, Bizau

    ...modernised, changed in their formation and adapted to today’s needs. Although this reduced the number of beds slightly, it has increased the numbers of rooms sold. The design deliberately retreats and is dominated by mute surfaces of timber and plaster....

  • Kaufmann Holz AG – Factory Hall Au, Reuthe

    ...m³ of dry and processed stock. It was paramount to quickly turn around a new hall and a warehouse for all sorting and drying of timber, for the company to get back to business. For planning and building permits 4...

  • Foot and Cycle Bridge, Zwischenwasser

    ...was prefabricated and mounted on site with a crane truck, in order to get the old bridge replaced as soon as possible. With a light and transparent construction, the new boardwalk over the river Frutz gives the leading role to...

  • Oxa Store, Bildstein

    A wonderful new design of a community lynch-pin. The former kiosk of Bildstein, which was affiliated to the restaurant “Ox”, is the only shop in the village. If it did not exist, the residents would have to get into...

  • Sutterlüty, Lochau

    From the old we make the new. Originally built in the 1990’s, Sutterlüty in Lochau had to be rebuilt due to structural defects which had caused damage to the roof. The existing foundations had to be considered with regards to...

  • Hotel Engel, Mellau

    Re-oriented towards a new direction and a new future. A tourist’s expectations are hard to live up to, and fashions and trends in tourism are always changing. At The Hotel Engel, in Mellau, it was obvious their time of meeting...

  • Assisted living, Mittelberg

    ...addition, we are not convinced that it is right to expand the space around the area of ​​the garage that is to be demolished, because it is too big in relation to the village. A structural consolidation at this point...

  • Olpererhütte, Ginzling

    ...reservoir, opposite it the glaciers and the mountain tops of the Zillertal Alps. Since refurbishment of the old building was impossible, in 2005 the decision was made to build a new one. Our company principle of “innovation through reduction” is...

  • Transfer Living Vorarlberg Blattur, Götzis

    ...one of the best ways for refugees to re-establish their roots and to locate and ground themselves.« explains co-initiator Andreas Postner To enable residents to enjoy time together a spacious lounge with a sunny outdoor seating area was created, welcoming...

  • Dorner Electronic, Egg

    Inside, timber encases innovative technology. Outside, it responds to the local environment. In the 1960’s, Dorner Electronic was a major supplier of electronic devices to Russia. Since then it has evolved from a two-man company, into one with over...

  • Textile School, Dornbirn

    ...half of this century. Since 1981 the buildings, owned by the federal government, ha been vacant. The idea to revitalise the entire area was developed by the city of Dornbirn, with an aim to give the architecturally sound buildings a...

  • Rheinhof, Hohenems

    The perfectly optimised modest family home. It is often said that from the ashes of a tragedy, something beautiful rises. This applies to the Rheinhof in Hohenems. After a fire devastated the educational buildings it was decided to invest...

  • BSBZ - Landwirtschaftsschulen Vorarlberg, Hohenems

    ...subsequently lead to two courtyards. The entrance yard of the school, with adjoining multi-purpose hall, marks the actual centre of the complex. If one tries to attribute the existing building, together with the surrounding open spaces for agriculture and sport,...

  • energie campus montafon, Vandans

    ...centre for apprentices. The compact building blends into the growing ensemble and is connected to the central administration building by a carefully landscaped park. On top of the concrete basement, with technical and service zones, four storeys were built in...

  • New thermal baths, Obersdorf

    A solitary light in lush parkland. The beneficial effects of water have a long tradition in the spa town of Oberstdorf. For this reason, a newly designed spa complex is to be built to the south of the spa parkland....

  • High-rise timber house - Queckareal, Tübingen

    The tall wood house Gartenstrasse leads from the medieval core of the southern German university town of Tübingen along the Neckar to the east to the mouth of the Ammer. There, on the site of the former Queck cement factory,...

  • iCampus Werksviertel, Munich

    ...of the area, in which the planned office building will hold an important position, forming the connection to the surrounding structures. The recessed nature of the ground floor zones enables generous public passage to and from the technology centres to...

  • Sutterlüty, Landammanngasse - Rankweil

    Arcades over a calm and enjoyable space A compact structure replaces the outdated large-scale supermarket in the mixed use zone, north of Rankweil railway station. The playful outdoor space is created by carefully placed plantings to create clear access routes...

  • Gastronomy pavilion Uferpark West, Überlingen

    ...pavilion. The two-storey building sits on the north-eastern edge of the plot, leaving enough space to the south and west for sun-flooded terraces with a wide view over the water. The large, glazed guest room also opens up to the...

  • State Secondary School, Bludenz

    ...adapted to match the new requirements of the school. The type of construction and materialisation of the renovation of the existing building takes place under consideration of the existing building fabric. The new school wing is a reinforced concrete skeleton...

  • Gaudier Bzreska Vocational School, Orleans

    ...a new building was commissioned. This new space, with a total of 5000 m², is completely dedicated to the training of woodcraft professions. Spacious, with room for the sun light to poor in, it had to be the embodiment of...

  • Rectory, Krumbach

    ...Kaufmann, Bernardo Bader and René Bechter of Bechter Zaffignani conducted a study to strengthen the centre. If you want to achieve something in Vorarlberg, you have to build a house.” | Remarkable architecture: not rash, not cheaply plastered, but committed...

  • Lino, Montagnola

    ...wide view over Lake Lugano. For a secure foundation, a massive reinforced concrete base was poured into the steep ground, on top of which stands a construction of timber walls and cantilevered laminated ceilings. The development of the three-storey volume...

  • Kehl/Fischer, Burgebrach

    ...community in Upper Franconia.The result is a tailor-made building volume whose rooms blend into each other, alternating from dense to generous. The living and sleeping areas open onto the sun filled garden planted with vegetation. On the north side the...

  • Sutterlüty, Rohrbach - Dornbirn

    Bringing the marketplace to the customers. Sutterlüty puts the ‘market place’ at the centre of their considerations when planning the new branch in Dornbirn, Rohrbach. They want to create and experience for their customers that is reminiscent of doing...

  • Interpark Focus - Jura, Röthis

    ...the new building is formally divided into three-storeys with connecting glass corridors, and a six-storey tower on the ground floor of which there is a restaurant. The three-layer reinforced concrete prefabricated elements, that characteristically appear on the facades, together with...

  • Biomass heating plant, Zürs

    ...and the natural environment partially restored. The functionality is clearly visible. The heating house is attached to the open warehouse. The topography has logistical advantages, the wood chips can be delivered to the warehouse, which is above the heating house...

  • Biomass Heating Plant, St. Christoph

    Meeting all safety requirements and the needs of the land. This biomass heating plant is located in open countryside to the south-west of St. Christoph. The clear structure is integrated into the surrounding landscape through its reserved design. In the...

  • "Together House” Ellenbogen, Bezau

    ...renovated and thermally refurbished to accommodate various social amenities. After consultation with the Federal Monuments Office, original doors, panelling and parquet floors were removed, restored and carefully put back into place. The windows however, were replaced by new replicas made...

  • Nürnbergkareal phase 2, Absam

    ...central place in the spacious green area invites people to meet and linger. A filigree piece of art is installed in one of the stairwells, which amazes the children. The community library is a great place to exchange ideas and...

  • Solar School, Dafins

    The first solar powered school in Austria. The idea of this design was to maximise the south-facing exterior space for the school due to the small building site. The school and kindergarten were attached to the eastern cemetery wall, as...

  • Chapel, Bizau

    Combining light, timber, glass and steel to create a space of comfort for mourners. The integration of a ‘Aufbahrungsraumes’ into a historic cemetery complex is an interesting task, especially as an answer to the eternal questions surrounding restoration and...

  • Chapel, Reuthe

    ...on a hill, the cemetery is located on an artificial terrace, about 3 meters lower. In order to be able to integrate the Chapel of Rest into the cemetery, it was necessary to enlarge it by extending the cemetery wall....

  • Moosbrugger, Bizau

    ...alternates around the windows and parapets. The porches on the south side are integrated into the appearance. | In the implementation, a high importance was placed on regional value creation. The spruce and fir timber needed for the construction comes...

  • Untere Aue, Lustenau

    ...accessible public housing. The focus is to combine high-quality construction with modern ecological and energy standards.« Vogewosi-Geschäftsführer Dr. Hans-Peter Lorenz The 2nd and 3nd construction phase will be built according to the PHPP guidelines at a Passive House standard, the...

  • Geroldsegg, Schwarzenberg

    ...architects were able to show them that development could initiate a combined exercise in quality, design and materials.« Bauwelt 2006 While its design and material choices were inspired by local traditions, the building, located perpendicular to the slope, adapts to...

  • Oberdorf 564, Sulzberg

    ...system, while in other models the energy is first led into a boiler in the basement and then comes into the living rooms; the energy goes directly into the living space and what is not needed goes into the boiler....

  • Center for Children - Steinbockallee, Rum

    A timber and concrete hybrid, creating openness and energy efficiency. Residential development in Rum made it necessary to build another kindergarten. The centre for children creates, with the two residential buildings, a three-sided enclosed courtyard. It is a semi-public place,...

  • Doppelmayr, Wolfurt

    ...is fully developed to site boundaries. This supports the latter, because adherence to a moderate height development seems right in this location. The building should not protrude significantly above the rows of trees on the south side. Concept approach The...

  • Isar-Würm-Lech, Landsberg am Lech

    ...attention should be paid to the use of materials which are not harmful to human health. All material decisions should be subject to them same criteria as we experience when building the community center in Ludesch. The use of durable...

  • Neubaugasse, Lauterach

    Densification with a sense of purpose. The tight-knit network of settlements in the Vorarlberg Rhine Valley is interspersed with farmland, orchards and gardens. As part of sustainable spatial planning, cautious structural densification takes place in order to preserve the original...

  • Im Haag, Lauterach

    High-quality and unobservable retreat areas increase living quality. A large building plot was reconfigured, due to the demolition of a centrally placed house, allowing two duplex units to be built. The elongated main structure, with its exact southern orientation...

  • Provost Residence St Gerold - Riding Hall, St. Gerold

    Timber and glazing are used to create a sense of protection in an open space. After decades of decay, the St. Gerold’s Priory was carefully restored. Today it is a thriving cultural centre. After the renovation of the existing facilities,...

  • B&O wooden multi-storey car park, Bad Aibling

    Parking in the park An innovative mixed-use district is growing in the north of the Upper Bavarian town of Bad Aibling. It is designed to be emission-free and built entirely from renewable raw materials. This multi-storey car park is made...

  • School on a slope, Frankfurt (Bergen-Enkheim)

    ...and the library in the socle, opening the classrooms to the two playgrounds. The outdoor facilities will be more closely integrated into the architectural concept, in the south of the complex a new cafeteria will be built and the existing...

  • Gaudier Bzreska Vocational School, Orleans

  • Mühlweg, Wien

  • Hotel Ifen, Hirschegg

  • New housing, Krumbach

    ...behind the bus stop, while the residential building to the north has moved closer to the road. This creates a clearly defined outdoor space on which the public spaces of assisted living are aligned. Through this forecourt all functions are...

  • Herrenhofgasse, Feldkirch

    Urban Design The proposed development continues from the existing environment and divides the required total volume into two structures. The resulting building is adapted to the surrounding family houses and blends seamlessly into the existing location. Building organisation A recessed...

  • Hofsteig waste material collection centre, Lauterach

    ...should be designed to correspond with the local heating plant. The aim is to achieve a creative interpretation of “reassurance”, and the qualities of the existing facade can be transferred to the new project. The strong timber facade is a...

  • Caritas Head Office, Salzburg-Herrnau

    ...a buffer zone to the street. This meeting zone forms the connection for traffic and as an extended access area for administration, CARLA and kindergarten. Central to this square is the expanded access to the footpath and to a patch...

  • Waste material collection centre Vorderland, Sulz

    ...the ASZ directly. The entrance to the hall is via the eastern gate and leads past the administration and small containers, to the sawtooth ramp. From there it is possible to leave the hall in the southwest via one of...

  • IZM Illwerke Zentrum Montafon, Vandans

    ...present draft is the use of timber in the structure. This requires compensatory measures to meet the fire protection requirements, which, according to the current state of standardisation, lead to a higher level of fire protection than conventional buildings. The...

  • Hannoverhaus, Mallnitz

    ...of the design is to situate the building so skilfully that no major terrain changes are required except in the area of the necessary terrace. In order to deliver this the house is not centred on the ridge but moved...

  • Stallinger, St. Georgen im Attergau

    The basement and the surrounding free-standing columns are made of in-situ concrete, the rest of the construction is provided in timber. To ensure the greatest possible flexibility, the entire building is designed in a grid of 2.60 m as a...

  • Owens "House Drexel", Warth

    ...constructed the wider region has dramatically changed due to tourism however, Warth has manged to keep hold of a lot of its original charm. In order not to affect the atmospheric heritage of Warth, the “Haus Drexel” must be kept...

  • Revitalisation Kirchgasse, Dornbirn

  • Bildungshaus St. Arbogast - renovation, Götzis

    ...joined forces again to gently renovate the complex and to equip and design it in a contemporary way. The renovations were carefully designed to give the existing building a high degree of openness, transparency and comfort and to create additional...

  • Kaeser Ladepark, Coburg

    The charging park is a counter-design to the insincerity of globalised petrol station concepts in order to meet the need for “fuel” at a local level in a holistic new way. Architecture and open space design go hand in hand...