Searchresults for Copa Airlines 800-299-7264 Reservations Cheap Plane Tickets

  • Dorner Electronic, Egg

    ...given that the existing structure was primarily built of timber, it seemed – despite some reservations from the client – only natural to encase the headquarters in the gradually weathering timber that is native to the region. The slightly cantilevered...

  • LifeCycle Tower

    ...been eliminated. Reservations are also had regarding the durability and safety of timber. The world’s tallest timber building to date, an eight-story timber construction housed on a concrete ground level was recently completed in London – facilitated by specific building...

  • Community Centre, Ludesch

    ...and ceilings are prefabricated box beams. The facades, as well as the interior walls and ceilings, are clad in silver fir. Depending on its particular use, the cladding is rough-sawn, wire-brushed or smoothly planed. The flooring of dark-oiled oak adds...

  • SWG screw factory Gaisbach GmbH, Waldenburg

    The firm SWG owns a screw factory, 230 employees produce up to 12 million screws a day, and the demand is rising. In response to a necessary expansion the idea initially was to develop the existing company headquarters with an...

  • 3-fach Sporthalle, Kempten

    A pillar construction as a place maker. The town of Kempten is considered the educational and administrative centre of the surrounding Allgäu region. A new triple sports hall, for up to 800 spectators, is to be built on the site...

  • Raiffeisenbank Bezau - Schalterhalle

    Die bestehende Schalterhalle wurde bis auf den Keller abgebrochen und an derselben Stelle ein moderner Neubau errichtet. Dieser entspricht dem Anforderungsprofil einer modernen Bank, insbe- sondere der Forderung nach Flexibilität. So ist der Schalterraum ein einfaches Rechteck mit wenigen Stützen....

  • Raiffeisenbank, Egg

    New headquarters of Raiffeisenbank Mittelbregenzerwald. In the middle of the village of Egg in the Bregenzerwald, Austria the new headquarters of the Raiffeisenbank will be built. One of the goals of the new building is to build a simple, but...

  • Im Haag, Lauterach

    High-quality and unobservable retreat areas increase living quality. A large building plot was reconfigured, due to the demolition of a centrally placed house, allowing two duplex units to be built. The elongated main structure, with its exact southern orientation...

  • Provost Residence St Gerold - Riding Hall, St. Gerold

    Timber and glazing are used to create a sense of protection in an open space. After decades of decay, the St. Gerold’s Priory was carefully restored. Today it is a thriving cultural centre. After the renovation of the existing facilities,...

  • 24.-25. April | Mission: Climate-friendly timber construction culture | Lecture Christoph Dünser

    ...construction offensive and in cooperation with vorarlberger holzbau_kunst, Proholz Bayern and Lignum Holzwirtschaft Schweiz. Vanue: Graf Zeppelin Haus, Friedrichshafen Lecture: Christoph Dünser, HK Architects Day 2 at 11:30 | Topic: Structural building with hardwood Tickets and further information at: proHolzBW...

  • Ceremonial inauguration of the Schmuttertal High School in Diedorf

    After two years of construction, the Schmuttertal Gymnasium was inaugurated on October 21, 2015. It was planned and built with an integral and future-oriented approach, as a nationwide unique lighthouse project. It was necessary to combine economic, ecological and social...