Searchresults for 24XO7 = 1 800-299-7264 United Airlines Phone Number F0r Flight Reservations

  • SWG screw factory Gaisbach GmbH, Waldenburg

    ...timber binds the carbon from 1 ton of CO2 from the atmosphere in the long term. In addition, other materials are replaced that would release CO2 again during their manufacture. Since a total of around 1,800 m³ of timber is...

  • Gutsbetrieb Rheinhof, Hohenems

    ...is airy and marked by a large number of unique elements. This is related to the decision to use timber from nearby forests: the length of the wood was limited to that which could be found locally. Gluelam technology was...

  • Fire department, Schnepfau

    ...and against the slope, it is framed by smaller chambers, in which the areas for maintenance and inventory are organised, as well as operational areas, the technic-room, and storerooms. | The single-flight staircase on the east side of the building...

  • Indoor swimming pool, Bregenz

    ...bathing hall that is flooded with light and has panoramic views, opens out between the foundations containing the swimming pool technology, and a delicate roof structure that is supported by pillars. The guest is led via a generously curved flight...

  • Dorner Electronic, Egg

    ...given that the existing structure was primarily built of timber, it seemed – despite some reservations from the client – only natural to encase the headquarters in the gradually weathering timber that is native to the region. The slightly cantilevered...

  • LifeCycle Tower

    ...been eliminated. Reservations are also had regarding the durability and safety of timber. The world’s tallest timber building to date, an eight-story timber construction housed on a concrete ground level was recently completed in London – facilitated by specific building...

  • IZM Illwerke Zentrum Montafon, Vandans

    ...the flexibility of use plays a crucial role in the long-term and sustainable usability of a building. In the present draft, the area efficiency is above 0.80 (= ratio of NF to BGF). The estimated construction costs (cost ranges 1-6)...

  • Community Centre, Ludesch

    ...publication compares conventional building materials and construction methods with green alternatives. Tenders were invited for both conventional and green building methods. In the end, a green building was created, at an additional cost of only 1.9 % The three blocks...

  • 3-fach Sporthalle, Kempten

    A pillar construction as a place maker. The town of Kempten is considered the educational and administrative centre of the surrounding Allgäu region. A new triple sports hall, for up to 800 spectators, is to be built on the site...

  • Brock Commons Tallwood House, Vancouver

    ...around € 10 billion each year. Not surprisingly, the building material in the region has a long tradition, but what is astonishing is the low level of innovation in modern timber construction in Canada. Conventional constructions methods dominate. Small scale...

  • Sutterlüty, Hohenems

    ...the largest number of gimmicks imaginable. Sutterlüty’s new commercial centre in Hohnems was designed to be the antithesis of those ubiquitous, glaring, banal shaped boxes. »This shopping centre demonstrates that retail complexes do not have to be bland or impersonal.«...

  • Zerlauth, Frastanz

    The antithesis of cubist architecture, open angular rooms under an abstract roof. Frastanz, in Austria, is home to a large number of international businesses. In contrast to the Bregenzerwald region, this area is firmly in the grip of a...

  • Hauser, Hohentannen

    Abundant space in a simple shell. A house for a movement therapist and a music teacher should be designed according to the individual needs of its residents. But in the newly developed area, a large number of planning parameters had...

  • Unterstein, Langenegg

    ...The developer Morscher Bau- & Projektmanagement GmbH from Mellau built a number of units that use the constructive language for which Vorarlberg is known. Most of the facades are made of wood – as are these two buildings. Morscher calls...

  • Hotel Schwanen, Bizau

    ...modernised, changed in their formation and adapted to today’s needs. Although this reduced the number of beds slightly, it has increased the numbers of rooms sold. The design deliberately retreats and is dominated by mute surfaces of timber and plaster....

  • Hotel Schmiedberger, St. Johann

    ...floor, accessible to hotel guests and the public, integrated in the southern part of the building. The entire complex has 102 beds. The upper floors 1-4 in the northern and the upper floors 2-3 in the southern wing of the...

  • Haus mitanand - Ellenbogen, Bezau

    ...timber according to ecological and modern structural engineering requirements, as well as the requirements of the Passive House standard. The timber cladding is in the style of the existing building that will be demolished. The large number of parking spaces,...

  • Recycling Centre Vorderland, Sulz

    ...noise and emissions, but opens up via the saw-tooth loading bay to the access road. It was desirable to reduce the number of materials and components used to just a chosen few, the large-scale roof construction transfers its static loads...

  • Student Housing, Rosenheim

    ...built as prefabricated timber modules in the factory and then assembled on site. This design also makes it possible to minimise the number of working days on site and the associated weather dependency. The existing local system feeds low-temperature floor...

  • Raiffeisenbank, Egg

    ...say ‘grand’, ‘incredible’ and ‘ingenious’. This definitely applies to the bank in Egg.« Best of Austria 2010/2011 The plan is to build a 4-storey, fully timber-framed bank with a total floor space of more than 1,400 m². The individual storeys...

  • Im Haag, Lauterach

    High-quality and unobservable retreat areas increase living quality. A large building plot was reconfigured, due to the demolition of a centrally placed house, allowing two duplex units to be built. The elongated main structure, with its exact southern orientation...

  • Provost Residence St Gerold - Riding Hall, St. Gerold

    Timber and glazing are used to create a sense of protection in an open space. After decades of decay, the St. Gerold’s Priory was carefully restored. Today it is a thriving cultural centre. After the renovation of the existing facilities,...

  • Timber Construction Day 2019: Lecture in Oslo

    ...engineer Ratio bois Sárl, present their innovative designs. Path Architects + Kaiser Group are both an architecture and contracting firm, and a leader in the use of mass timber in multi-story buildings in the United States. They will talk about...

  • The most beautiful books in Austria 2008: Hermann Kaufmann Woodworks

    ...considered excellent. With 211 submitted publications, from more than 100 publishers and designers, this year saw the largest number of entries. The competition “The most beautiful books in Austria” is annually published by the Federal Ministry of Education, the Arts...

  • The Olpererhütte Ginzling receives the Best Architects Award 2009

    The “Best Architects 09” award received the highest number of entrants since the awards were founded. 189 outstanding projects were submitted to the award. This year’s jury found it particularly difficult to select the best of the best. A total...

  • Hermann Kaufmann receives the Toni Russ Prize

    ...in front of an audience of over 400 guests at the Bregenzer Festspielhaus, with the 34th Dr. Toni Russ Award. “What is extraordinary is the great number of excellent architects and the depth the reputation has penetrated into the region....

  • 1st prize for a proposed development of the former Spicher school

    ...appearance of the building corresponds to the request for a residential building in timber, and is rated positively. The building maintenance and building operation, due to the large number of detached houses requires effort. Lanes between the building units must...

  • Awarded 1st place in the bid for Russareal Lochau

    ...styles and also differentiated designs, while maintaining its materiality. Very sensitively and skilfully, every building responds in each case to its environment and its peculiarities. Due to the relatively high number of building structures (compared to the project), they inevitably...

  • Experts discuss the very best Timber has to offer

    ...who wants to move towards more timber construction and is looking for initial contacts. Participation is free of charge. Since the number of participants is limited to 150, it is important to register here quickly, but no later than March...

  • New building in Neubaugasse

    ...buildings with 2-, 3- and 4-room flats + common room Number of storeys: E+3 (house A, B), E+2 (house C) 38 flats, 38 underground parking spaces Special features: Exterior walls + facade in wood Heating system: groundwater heat pump with...

  • Ceremonial inauguration of the Schmuttertal High School in Diedorf

    After two years of construction, the Schmuttertal Gymnasium was inaugurated on October 21, 2015. It was planned and built with an integral and future-oriented approach, as a nationwide unique lighthouse project. It was necessary to combine economic, ecological and social...

  • Hermann Kaufmann Awarded Bezau Assisted Living Development

    ...the different levels. The elevator provides accessibility. The opening of the central corridor provides orientation in connection with the structure and, allows for a reduction in the number of access points. Another result of this central corridor is an attractive...

  • klima: aktiv Gold for Multi-Apartment Construction in Sulzberg

    ...aktiv Bauen und Sanieren” found an absolute winner in this project. The multi-family dwelling achieved 979 points, the highest point number of all multi-family buildings in Austria so far and therefore exceeding the requirements of 900 points, making it a...

  • Energy and Climate Protection: Particularly climate-friendly constructions honored – such as the project Unterstein, Langenegg

    ...Bau” – partly in collaboration with “Wohnbauselbsthilfe” with 10 projects – are the developers presenting the highest number of certified buildings this year. Among the honored buildings are also the last two winners of the State Prize, the office and...

  • Role Model Recycling Centre in Langerringen - Germany

    The Augsburg district will halve the number of recycling centers by 2035, particularly affecting smaller municipalities. One of the winners of the new distribution concept is Langerringen, where a modern environmental competence center is set to be established next year....

  • Legal notice

    HK Architekten Hermann Kaufmann + Partner ZT GmbH Sportplatzweg 5, 6858 Schwarzach T +43 5572 58174 F +43 5572 58174-66 office@hkarchitekten.at www.hkarchitekten.at Financial District: Landesgericht Feldkirch UID: ATU39334902 FN: 131640p Member of the Chamber of Architects & Engineering Consultants Vlbg...

  • Office Profile

    ...initiative. Office Characteristics Areas of Expertise Architecture planning Site supervision Site coordination Timber construction specialist Financial District Landesgericht Feldkirch UID ATU39334902 FN: 131640p Member of the Chamber of Architects & Engineering Consultants Vlbg and Tirol 6020 Innsbruck Membership number 23054...

  • Privacy Policy

    Hermann Kaufmann + Partner ZT GmbH Sportplatzweg 5, 6858 Schwarzach T +43 5572 58174 F +43 5572 58174-66 office@hkarchitekten.at www.hkarchitekten.at Financial District: Landesgericht Feldkirch UID: ATU39334902 FN: 131640p Member of the Chamber of Architects & Engineering Consultants Vlbg and Tirol,...

  • Building with wood – A path to the future I Munich

    The United Nations proclaimed 2011 the ‘International Year of Forests’. On this occasion, the Architecture Museum, together with the Department of Timber Construction of the Technical University of Munich, presented the technical, economic and design possibilities of the material in...