Searchresults for 24X7 = 1800-299-7264 Allegiant Air Phone Number Reservations

  • Gutsbetrieb Rheinhof, Hohenems

    ...is airy and marked by a large number of unique elements. This is related to the decision to use timber from nearby forests: the length of the wood was limited to that which could be found locally. Gluelam technology was...

  • Ölzbündt, Dornbirn

    ...possible to heat incoming air even if it is a minimal amount of air that is circulated. Compact, individually adjustable devices control the ventilation and heating in every apartment. Fresh air is heated to minimum of 0° centigrade by the...

  • Messehallen 9-12, Dornbirn

    ...recovery as well as a heating and cooling coil for supply air conditioning. The energy is supplied via a nearby heat or cooling network. The advantage of the decentralised system is the complete elimination of the supply and exhaust air...

  • Agricultural school, Salzkammergut

    ...centre for these two areas is aimed for. Own central equipment for kitchen ventilation, gym and food processing. Isothermal air intake at 22 ° C in summer and winter. To ensure the constant supply air temperature in the ventilation units...

  • Community Centre, Ludesch

    ...envelope and a state-of-the-art ventilation system with additional heat recovery. The ventilation system is connected to a groundwater pump and supplies the rooms, according to their specific uses, with pre-heated or pre-cooled fresh air. In winter the groundwater temperature is...

  • Student Housing, Rosenheim

    ...built as prefabricated timber modules in the factory and then assembled on site. This design also makes it possible to minimise the number of working days on site and the associated weather dependency. The existing local system feeds low-temperature floor...

  • Hauser, Hohentannen

    Abundant space in a simple shell. A house for a movement therapist and a music teacher should be designed according to the individual needs of its residents. But in the newly developed area, a large number of planning parameters had...

  • Sutterlüty, Hohenems

    ...the largest number of gimmicks imaginable. Sutterlüty’s new commercial centre in Hohnems was designed to be the antithesis of those ubiquitous, glaring, banal shaped boxes. »This shopping centre demonstrates that retail complexes do not have to be bland or impersonal.«...

  • Zünd assembly and logistics hall, Altstätten

    Industrial hall with daylight and fresh air. The existing location of Zünd Systemtechnik AG has reached its capacity limits, the construction of a new assembly and logistics hall is inevitable. In order to sound out suitable design and construction strategies,...

  • House of Sustainability, Ruggel

    ...excess height also guarantees a higher indoor air quality for larger meetings. Despite its openness, the design offers many opportunities to create separate areas for individual tenants, which can be extended or reduced if necessary. The cross-floor spaces could be...

  • Hotel Bellevue, Les Houches

    ...glazing. At the heart of this is a ventilation system that supplies the building with the necessary fresh air and returns the energy from the waste air, which is normally lost, to the building via heat exchangers. Together with a...

  • Isar-Würm-Lech GmbH, Landsberg am Lech

    ...an optimised building envelope and high levels of daylight utilisation. To generate heat, the wood remnants are salvaged and used. For the hot water preparation, the waste heat of the compressed air generation is used. The heat transfer in the...

  • Haggen - residential area, St. Gallen

    ...need for large spans. energy The residential buildings are provided in Minergie-Standard. It is proposed a decentralized ventilation system. The ventilation units are located in the residential buildings each in the suspended ceiling, from which the air distribution over the...

  • Isar-Würm-Lech, Landsberg am Lech

    ...For the hot water preparation, the waste heat of the compressed air generation is used. As a result, inefficient short-term operation of the biomass boiler can be prevented, especially in the summer. The transfer of heat in the production and...

  • Metzler-Holz KG - Storage Warehouse, Bezau

    What is more obvious a solution than building a warehouse for timber, from timber? The sawmill and timber trading company needed a 30 x 60 meter, pillar-free hall for the storage of dried timber, as well as for the air...

  • LifeCycle Tower

    ...been eliminated. Reservations are also had regarding the durability and safety of timber. The world’s tallest timber building to date, an eight-story timber construction housed on a concrete ground level was recently completed in London – facilitated by specific building...

  • Dorner Electronic, Egg

    ...given that the existing structure was primarily built of timber, it seemed – despite some reservations from the client – only natural to encase the headquarters in the gradually weathering timber that is native to the region. The slightly cantilevered...

  • Recycling Centre Vorderland, Sulz

    ...noise and emissions, but opens up via the saw-tooth loading bay to the access road. It was desirable to reduce the number of materials and components used to just a chosen few, the large-scale roof construction transfers its static loads...

  • SWG screw factory Gaisbach GmbH, Waldenburg

    ...services. In order to ensure a high degree of flexibility in the production processes, the number of supports in the hall is reduced to a minimum. The supporting structure consists of eight parallel, lengthways, 82 m long and 3.8 m...

  • Hotel Schmiedberger, St. Johann

    ...highly thermally insulated outer shell. The element construction method makes it possible to ideally use a large number of Egger products. In addition, the interior offers different applications for the products from Egger. The outward appearance of the hotel is...

  • Zerlauth, Frastanz

    The antithesis of cubist architecture, open angular rooms under an abstract roof. Frastanz, in Austria, is home to a large number of international businesses. In contrast to the Bregenzerwald region, this area is firmly in the grip of a...

  • Brock Commons Tallwood House, Vancouver

    ...authorities increased the maximum number of storeys from four to six in order to increase the height of wooden buildings. For the 53 m high dorm this change was not enough. However, the campus has its own building regulations and...

  • Haus mitanand - Ellenbogen, Bezau

    ...timber according to ecological and modern structural engineering requirements, as well as the requirements of the Passive House standard. The timber cladding is in the style of the existing building that will be demolished. The large number of parking spaces,...

  • Hotel Schwanen, Bizau

    ...modernised, changed in their formation and adapted to today’s needs. Although this reduced the number of beds slightly, it has increased the numbers of rooms sold. The design deliberately retreats and is dominated by mute surfaces of timber and plaster....

  • Unterstein, Langenegg

    ...The developer Morscher Bau- & Projektmanagement GmbH from Mellau built a number of units that use the constructive language for which Vorarlberg is known. Most of the facades are made of wood – as are these two buildings. Morscher calls...

  • High-rise timber house - Queckareal, Tübingen

    ...is covered by the connection to the existing district heating network. The room ventilation takes place via manually operated, opaque window sashes as well as a controlled ventilation system with heat recovery, which ensures a supply of moderated fresh air....

  • woodpassage

    ...buildings store carbon over their entire lifespan, the amount of wood used in the forest grows again and actively extracts CO2 from the surrounding air. Wood as a building material thus has a doubly positive effect on the CO2 balance....

  • Children’s care centre, Kennelbach

    ...support and to offer a creative aesthetic. This gives the care centre a pleasant atmosphere and it achieves optimum indoor air quality. The facades also have a timber theme, but they vary. The large windows are partially flush with the...

  • Pflegeheim, Mauren

    ...room of silence, hairdresser and administration offices. The open-air areas on the property are located along the Jugendweg to the east and to the west with the protected Dementia Garden. At the lower component, a roof garden with covered seating...

  • Environmental Education Center Britzer Garten, Berlin

    ...The ecological footprint of the building was improved by the choice of renewable building materials making its footprint considerably lower than comparable structures in mineral construction. An air heat pump and extensive green roofs support this sustainable and resource-conscious concept....

  • Burger, Wolfurt

    ...enables heating via living space ventilation or small wall heaters in the individual rooms on the upper floor. The heating concept integrates a wood-burning stove in the living area, which heats both the supply air and the hypocaust. The basement...

  • Untere Aue, Lustenau

    ...condensing natural gas boiler. The heating of the apartment is provided by a low-temperature floor heating with a flow temperature of max. 35°C. The apartments are ventilated by a central ventilation system. The fresh air intake takes place via a...

  • Owens "House Drexel", Warth

    ...walls. The new panelling consists of unlined planks, whose irregular shape gives mechanical manufacturing an air of craftsmanship. Once the timber has been aged by the sun the house will no longer stand out. Inside, the renovations focus on creating...

  • Cloister Mehrerau School Bregenz

    ...the rendered neighbouring buildings that surround this specific situation. The energy concept of the building is state-of-the-art. The energy is powered by a recycled wood-chip plant. Controlled building ventilation is not only significant for the air quality in the school,...

  • Center for Children - Steinbockallee, Rum

    ...with play areas for the children and access paths to the residential blocks. The entire basement is underground parking, refuse and storage rooms. »The air quality and light quality improves the readiness to learn and also improves the concentration levels...

  • Legero, Graz

    The shoe factory Legero, which was founded in 1872, is planning a new headquarters with an outlet shop with administration and sales area, in the area next to Graz airport. The urban arrangement of the design creates a division characterised...

  • Im Haag, Lauterach

    High-quality and unobservable retreat areas increase living quality. A large building plot was reconfigured, due to the demolition of a centrally placed house, allowing two duplex units to be built. The elongated main structure, with its exact southern orientation...

  • Raiffeisenbank, Egg

    ...the second floor. The third floor is intended as a social area for employees or for training. There is a spacious roof terrace that offers a generous panoramic view of Egg. The upper floors are connected by spacious airy walkways,...

  • Interpark Focus - Jura, Röthis

    Open flexible design in the work place. The new administrative centre of the original Jura building, which was completed three years ago, now forms the entrance to the 120,000 m² business park Interpark Focus. Pivoting around a central open square,...

  • Sutterlüty J, Egg

    Open, light and airy. A large, almost villa-like space program is organised in a cross-shaped in response to the west and north slopes, fringed by a brook and groups of trees. The south-facing entrance opens up to a view of...

  • Textile School, Dornbirn

    Faithful renovation of mid-century architecture creates a new home for two Vorarlberg design institutes. The old textile school is considered a typical example of the architecture of the fifties, and one of the best in Vorarlberg from the first...

  • Neudorfstraße, Wolfurt

    First multi-storey timber construction for social housing in Vorarlberg, built as part of a subsidised housing scheme. Neudorfstrasse has been developed by a housing society in Vorarlberg, three years after the completion of the privately-financed “Ölzbündt” estate. The development is...

  • Nebelhorn Cable Car - Summit Restaurant, Oberstdorf

    ...top is just a simple gazebo that acts as the entrance to the restaurant and houses an open and light bistro. The glass fronts of the pavilion can be opened, to bring in the clear alpine air. The restaurant appeals...

  • YKK Passivetown, Kurobe

    ...the greatest energy consumption is expected (e.g., air conditioning). However, this should not pose a problem in the overall concept, as this period also offers the largest supply of solar energy. Large photovoltaic roofs integrated into the building roofs supply...

  • Bildungshaus St. Arbogast - renovation, Götzis

    ...loosely grouped on the different levels of the central stair hall, which leads to the upper floor. There, the planners extended two of the seminar rooms by raising the roof and integrating the existing balcony, which means that visitors now...